Yes — below is a Claude-ready PRD. I designed it for your exact use case: new factory supervisor joins Monday, Docmost will become the SOP hub, and the system should have a one-stop dashboard where he can access production, quality, raw material, stacking, curing, dispatch, reports and improvement suggestions.

Docmost is a good fit because it supports spaces, permissions, groups, nested pages, real-time collaboration, comments, page history, search, attachments, and diagrams like Draw.io, Excalidraw and Mermaid. n8n can later connect Telegram, webhooks and Odoo workflows for process control. ([docmost.com][1])

PRD: Maiyuri Bricks Visual SOP Knowledge Hub in Docmost

1. Product Name

Maiyuri Bricks Factory SOP Command Center

2. Objective

Create a complete, visual, easy-to-use SOP knowledge hub in Docmost for Maiyuri Interlock Bricks. The system should help the new factory supervisor understand, follow, improve and control daily factory operations from day one.

The output should be a neatly structured Docmost workspace with:

  1. A one-stop supervisor dashboard.
  2. Visual SOP pages.
  3. Process diagrams.
  4. Do/Don’t cards.
  5. Checklists.
  6. Escalation rules.
  7. SOP improvement suggestion flow.
  8. Links/placeholders for future n8n, Telegram, Odoo and Supabase process automation.

This is not a text-heavy manual. It should feel like a practical factory operating system.


3. Target Users

Primary User

Factory Supervisor

Responsibilities:

Secondary Users

Production Labour

Sales/Admin Staff

Management


4. Design Principles

  1. Visual first
  1. One page per SOP
  1. Factory-ready language
  1. Process control ready
  1. Controlled collaboration
  1. Mobile friendly

5. Recommended Docmost Structure

Create the following spaces in Docmost:

00 Supervisor Command Center
01 Daily Factory Control
02 Raw Material Control
03 Production Process
04 Quality Control
05 Stacking, Curing & Stock
06 Dispatch & Vehicle Planning
07 Sales, Customer Visit & Admin Support
08 Safety & Housekeeping
09 SOP Improvement Register
10 Management Review

6. Main One-Stop Dashboard

Create a landing page called:

Maiyuri Factory Supervisor Dashboard

Purpose

This dashboard is the single starting point for the factory supervisor every day.

Dashboard Layout

Use cards/sections in this order:


A. Today’s Factory Control

Create quick-access cards:

  1. Daily Factory Opening Checklist
  2. Daily Production Planning SOP
  3. Daily Production Reporting SOP
  4. End-of-Day Closing Checklist
  5. Supervisor Escalation SOP

Each card should contain:

Example:

🏭 Daily Factory Opening
Check machine, labour, material, power, water and production plan before starting work.
[Open SOP]

B. Production & Quality

Cards:

  1. MIB 8-inch Mixing Recipe
  2. MIB 6-inch Mixing Recipe
  3. First 20 Bricks Approval
  4. Hourly Production Check
  5. Visual QC / Hold / Reject
  6. Batch Quality Score

C. Raw Material Control

Cards:

  1. Red Soil Receiving & Moisture Check
  2. M-Sand Dust Receiving
  3. Cement Receiving & Storage
  4. Raw Material Separation Zone
  5. Moisture Control

D. Stacking, Curing & Stock

Cards:

  1. 20-Brick Mini-Stack Method
  2. Sleeper/Base Support
  3. Batch Card / QR / NFC Tagging
  4. Curing Area Movement
  5. Ready-for-Dispatch Approval
  6. Stock Counting

E. Dispatch & Customer

Cards:

  1. Dispatch Planning
  2. Loading Verification
  3. Delivery Photo Proof
  4. Vehicle Maintenance Checklist
  5. Factory Visit Handling

F. Reports and Logs

Cards:

  1. Daily Production Report
  2. Raw Material Receipt Register
  3. QC Hold/Reject Register
  4. Dispatch Register
  5. SOP Improvement Register

G. Emergency / Escalation

Display a red alert box:

Call/Inform Ram or Srinivasan immediately if:
- Machine breakdown
- Major quality issue
- Raw material shortage
- Wet/contaminated red soil
- Labour shortage
- Customer complaint
- Dispatch error
- Safety incident

H. Weekly Supervisor Focus

Create a simple weekly plan:

Monday: Follow opening, planning and raw material SOPs.
Tuesday: Improve raw material separation and moisture control.
Wednesday: Focus on mixing and first 20 bricks approval.
Thursday: Focus on stacking, curing and hold/reject system.
Friday: Focus on dispatch, loading and customer visit handling.
Saturday: Submit SOP improvement suggestions.

7. Standard SOP Page Template

Every SOP page must follow this exact structure.

SOP Name:
Process Code:
Version:
Owner:
Applies To:
Frequency:
Last Updated:
Review Frequency:

1. Purpose

One sentence only.

2. Who Is Responsible

List responsible roles.

3. When To Use This SOP

Clear trigger condition.

4. Visual Process Flow

Use Mermaid or Draw.io style flowchart.

5. Step-by-Step Visual SOP

Use 5–8 steps only.

Each step should have:

6. Do / Don’t

Two-column table.

7. Checklist

Short tick-box checklist.

8. Records To Update

Mention whether to update:

9. Escalation Rule

When to inform Ram/Srinivasan.

10. Common Mistakes

List common mistakes.

11. Improvement Suggestion

Add:

If you find a better way to do this process, add a comment below or submit an improvement request in the SOP Improvement Register.

8. SOP Content Pack

Create the following SOP pages with the content below.


SOP 01: Daily Factory Opening Checklist

Process Code: DAILY_OPENING_V1
Owner: Factory Supervisor
Applies To: Factory Supervisor
Frequency: Daily before production starts
Review Frequency: Monthly

Purpose

Ensure the factory is ready for safe, smooth and planned production before work starts.

Responsible

Visual Process Flow

flowchart TD
A[Supervisor arrives] --> B[Check labour availability]
B --> C[Check machine and power]
C --> D[Check raw material availability]
D --> E[Check water and tools]
E --> F[Confirm today's production plan]
F --> G{Any issue?}
G -- Yes --> H[Inform Ram/Srinivasan]
G -- No --> I[Start production]

Steps

  1. Check whether all required labour are present.
  2. Check machine area for cleanliness and safety.
  3. Check power supply and machine readiness.
  4. Check red soil, m-sand dust, cement and water availability.
  5. Check tools, moulds, buckets, weighing method and cleaning tools.
  6. Confirm today’s production target.
  7. Inform management if any shortage or issue exists.

Checklist

[ ] Labour available
[ ] Machine ready
[ ] Power available
[ ] Water available
[ ] Red soil available
[ ] M-sand dust available
[ ] Cement available
[ ] Work area clean
[ ] Production target confirmed
[ ] Issues reported if any

Records To Update

Escalation

Inform Ram/Srinivasan if:


SOP 02: Daily Production Planning

Process Code: PROD_PLAN_V1
Owner: Factory Supervisor
Frequency: Daily morning

Purpose

Plan what product to produce, how much to produce, and what material/labour is needed.

Visual Process Flow

flowchart TD
A[Check stock and orders] --> B[Choose product]
B --> C[Set target quantity]
C --> D[Check material requirement]
D --> E[Assign labour]
E --> F[Start production batch]

Steps

  1. Check pending orders and stock requirement.
  2. Decide product to produce: MIB 8-inch, MIB 6-inch, CIB 8-inch, CIB 6-inch or solid block.
  3. Set target quantity for the day.
  4. Confirm material availability.
  5. Assign labour for mixing, machine, stacking and curing movement.
  6. Create or note batch ID.
  7. Start production only after first 20 bricks approval.

Checklist

[ ] Product selected
[ ] Target quantity fixed
[ ] Batch ID created
[ ] Material availability checked
[ ] Labour assigned
[ ] First 20 bricks approval planned

Records To Update


SOP 03: Red Soil Receiving & Moisture Check

Process Code: REDSOIL_RECEIPT_V1
Owner: Factory Supervisor
Frequency: Whenever red soil is received

Purpose

Ensure only suitable red soil is accepted and stored correctly.

Visual Process Flow

flowchart TD
A[Red soil vehicle arrives] --> B[Take vehicle/material photo]
B --> C[Check visible contamination]
C --> D[Check moisture]
D --> E{Acceptable?}
E -- Yes --> F[Unload in red soil zone]
E -- No --> G[Move to hold/reject decision]
F --> H[Update material receipt record]
G --> I[Inform Ram/Srinivasan]

Steps

  1. Take photo of vehicle and material before unloading.
  2. Check for stones, roots, plastic, waste or contamination.
  3. Check whether soil is too wet by hand test.
  4. Do not mix wet soil with dry soil.
  5. Unload only in marked red soil zone.
  6. If material is wet/contaminated, keep separate and inform management.
  7. Record supplier, quantity, date and status.

Do

✔ Take photo before unloading
✔ Keep wet and dry soil separate
✔ Use marked red soil zone
✔ Inform if quality is doubtful

Don’t

✘ Do not unload in m-sand area
✘ Do not mix old and new material without approval
✘ Do not use wet soil without approval
✘ Do not accept contaminated material silently

Checklist

[ ] Supplier identified
[ ] Quantity noted
[ ] Photo taken
[ ] Moisture checked
[ ] Contamination checked
[ ] Correct zone used
[ ] Receipt updated

Records To Update

Escalation

Inform Ram/Srinivasan if:


SOP 04: Raw Material Separation Zone

Process Code: MATERIAL_ZONE_V1
Owner: Factory Supervisor
Frequency: Daily

Purpose

Prevent material mixing, spillover and moisture damage.

Visual Process Flow

flowchart TD
A[Material arrives] --> B[Identify material type]
B --> C[Unload in marked zone]
C --> D[Maintain separation gap]
D --> E[Cover/protect if needed]
E --> F[Use material batch-wise]

Steps

  1. Keep red soil, m-sand dust, m-sand waste and cement separate.
  2. Mark each area clearly using board/paint/rope/brick boundary.
  3. Maintain gap between material heaps.
  4. Do not allow loader/labour to push one material into another.
  5. Keep red soil protected from ground moisture as much as possible.
  6. Use old material first unless quality issue exists.
  7. Keep waste material separately.

Checklist

[ ] Red soil zone clear
[ ] M-sand dust zone clear
[ ] Waste zone clear
[ ] Cement storage dry
[ ] No spillover between materials
[ ] Wet material separated

Escalation

Inform management if material is spreading, mixing or absorbing moisture.


SOP 05: MIB 8-Inch Mixing Recipe

Process Code: MIB8_MIXING_V1
Owner: Factory Supervisor
Frequency: Every MIB 8-inch batch

Purpose

Ensure consistent strength, finish and quality of MIB 8-inch bricks.

Visual Process Flow

flowchart TD
A[Confirm product: MIB 8-inch] --> B[Check materials]
B --> C[Measure recipe]
C --> D[Dry mix]
D --> E[Add water gradually]
E --> F[Check mix consistency]
F --> G[Start first 20 bricks]

Steps

  1. Confirm product is MIB 8-inch before mixing.
  2. Check red soil, m-sand dust, cement and water.
  3. Use approved mix ratio only.
  4. Add water gradually. Do not make mix too wet.
  5. Mix evenly before feeding machine.
  6. Produce first 20 bricks.
  7. Continue only after first 20 bricks are approved.

Recipe Placeholder

Add exact approved recipe here:

Red soil: ___
M-sand dust: ___
Cement: ___
Admixture: ___
Water: controlled by moisture condition

Correct Mix Signs

✔ Mix holds shape
✔ Not too dry
✔ Not sticky/watery
✔ Uniform colour
✔ No lumps

Wrong Mix Signs

✘ Too wet
✘ Too dry
✘ Cement lumps
✘ Uneven colour
✘ Soil stones/waste visible

Records To Update


SOP 06: First 20 Bricks Approval

Process Code: FIRST20_QC_V1
Owner: Factory Supervisor
Frequency: Every batch/product changeover

Purpose

Stop bad production before large quantity is produced.

Visual Process Flow

flowchart TD
A[Produce first 20 bricks] --> B[Check shape and edges]
B --> C[Check interlock fit]
C --> D[Check surface and cracks]
D --> E{Approved?}
E -- Yes --> F[Continue production]
E -- No --> G[Adjust mix/machine]
G --> H[Produce another sample]

Steps

  1. Produce first 20 bricks.
  2. Place them in sample inspection area.
  3. Check edge sharpness.
  4. Check cracks and surface finish.
  5. Check interlock fit.
  6. Check size consistency.
  7. Approve or stop production for correction.

Checklist

[ ] Edges are sharp
[ ] No visible cracks
[ ] Surface finish acceptable
[ ] Shape is correct
[ ] Interlock fit is correct
[ ] Mix is not too wet/dry
[ ] Supervisor approved continuation

Decision

PASS = Continue production
HOLD = Adjust and produce new sample
FAIL = Stop and inform management

Records To Update

Escalation

Inform management if two sample attempts fail.


SOP 07: Hourly Production Check

Process Code: HOURLY_PROD_CHECK_V1
Owner: Factory Supervisor
Frequency: Every production hour

Purpose

Catch quality issues early during production.

Visual Process Flow

flowchart TD
A[Every hour] --> B[Select sample bricks]
B --> C[Check visual quality]
C --> D[Check stack count]
D --> E{Issue found?}
E -- Yes --> F[Hold batch / correct process]
E -- No --> G[Continue production]

Steps

  1. Every hour, check sample bricks from current production.
  2. Inspect cracks, corner break, surface and size.
  3. Confirm stacking count.
  4. Check if mix consistency has changed.
  5. Stop and correct if defects increase.
  6. Record issue if any.

Checklist

[ ] Hourly sample checked
[ ] No major cracks
[ ] Edge quality acceptable
[ ] Stack count correct
[ ] Mix consistency acceptable
[ ] Rejection count noted

SOP 08: 20-Brick Mini-Stack & Sleeper Method

Process Code: STACK20_SLEEPER_V1
Owner: Factory Supervisor
Frequency: Every production batch

Purpose

Standardize stacking, protect bricks from ground moisture and make counting easy.

Visual Process Flow

flowchart TD
A[Prepare stack area] --> B[Place sleepers/base support]
B --> C[Stack 20 bricks]
C --> D[Keep batch card visible]
D --> E[Maintain gap between batches]
E --> F[Move to curing/stock stage]

Steps

  1. Prepare clean stacking area.
  2. Place rejected bricks/solid supports as sleepers.
  3. Do not allow good bricks to touch wet/dirty ground.
  4. Create mini-stacks of exactly 20 bricks.
  5. Keep batches separate.
  6. Place batch card in front of each batch island.
  7. Take photo if required.

Correct Stack

✔ 20 bricks per mini-stack
✔ Sleepers used below
✔ Batch card visible
✔ Gaps between batches
✔ Hold/reject separated

Wrong Stack

✘ Good bricks touching ground
✘ Mixed batches
✘ No batch card
✘ Irregular count
✘ Broken bricks mixed with approved bricks

Checklist

[ ] Sleeper used
[ ] 20 bricks per mini-stack
[ ] Batch card placed
[ ] Batch separated
[ ] Hold/reject not mixed
[ ] Photo taken if required

SOP 09: Visual QC / Hold / Reject

Process Code: VISUAL_QC_REJECT_V1
Owner: Factory Supervisor
Frequency: Every batch and before dispatch

Purpose

Separate approved, hold and rejected bricks clearly.

Visual Process Flow

flowchart TD
A[Inspect bricks] --> B{Quality status?}
B -- Good --> C[Approved stock]
B -- Doubtful --> D[Hold area]
B -- Bad --> E[Reject area]
D --> F[Management/QC decision]
E --> G[Record rejection reason]

Quality Categories

Approved

Good shape, no cracks, acceptable finish, correct size, ready for curing/dispatch.

Hold

Doubtful quality, under-cured, moisture issue, needs management/QC decision.

Reject

Broken, cracked, poor shape, wrong mix, poor compaction or not saleable.

Defect Reasons

Corner break
Crack
Poor compaction
Wrong size
Interlock mismatch
Too wet mix
Too dry mix
Surface powdering
Colour inconsistency
Handling damage

Checklist

[ ] Batch inspected
[ ] Approved stock separated
[ ] Hold stock marked
[ ] Reject stock moved to reject area
[ ] Reason recorded
[ ] Photo taken for major defects

Escalation

Inform Ram/Srinivasan if rejection is unusually high or if a full batch is doubtful.


SOP 10: Daily Production Reporting

Process Code: DAILY_PROD_REPORT_V1
Owner: Factory Supervisor
Frequency: End of each production day

Purpose

Capture actual production, rejection, stock and issues for management review.

Visual Process Flow

flowchart TD
A[Production ends] --> B[Count produced quantity]
B --> C[Count rejected quantity]
C --> D[Update batch status]
D --> E[Record issues]
E --> F[Send daily report]

Daily Report Format

Date:
Product produced:
Target quantity:
Actual quantity:
Rejected quantity:
Hold quantity:
Approved quantity:
Main issue:
Material shortage:
Machine downtime:
Labour issue:
Supervisor remarks:
Photos attached:

Checklist

[ ] Production quantity counted
[ ] Rejection counted
[ ] Hold stock counted
[ ] Batch cards verified
[ ] Issues recorded
[ ] Report sent

SOP 11: Curing Area Movement

Process Code: CURING_MOVE_V1
Owner: Factory Supervisor
Frequency: Per batch

Purpose

Ensure bricks move through curing without mixing, damage or under-curing.

Steps

  1. Move only batch-wise.
  2. Keep batch card with the batch.
  3. Do not mix approved and hold stock.
  4. Protect from unnecessary moisture/ground damage.
  5. Mark curing start date.
  6. Mark ready-for-dispatch date.

Checklist

[ ] Batch moved correctly
[ ] Batch card retained
[ ] Curing date recorded
[ ] Hold/reject separated
[ ] Ready date noted

SOP 12: Ready-for-Dispatch Approval

Process Code: READY_DISPATCH_QC_V1
Owner: Factory Supervisor
Frequency: Before dispatch

Purpose

Ensure only approved and ready bricks are dispatched to customers.

Steps

  1. Confirm batch/product/quantity.
  2. Confirm curing age/status.
  3. Check visual quality.
  4. Confirm no hold/reject bricks are mixed.
  5. Confirm delivery plan.
  6. Approve loading.

Checklist

[ ] Correct product
[ ] Correct quantity
[ ] Curing complete
[ ] Visual QC passed
[ ] Batch card verified
[ ] Approved for loading

SOP 13: Dispatch Planning

Process Code: DISPATCH_PLAN_V1
Owner: Factory Supervisor
Frequency: Every dispatch

Purpose

Plan delivery correctly and avoid wrong product, quantity or site delivery.

Steps

  1. Confirm customer/site name.
  2. Confirm product and quantity.
  3. Confirm site location and access.
  4. Confirm vehicle and driver.
  5. Confirm loading time.
  6. Confirm payment/approval status if required.
  7. Inform sales/admin.

Checklist

[ ] Customer confirmed
[ ] Site confirmed
[ ] Product confirmed
[ ] Quantity confirmed
[ ] Vehicle confirmed
[ ] Driver confirmed
[ ] Loading time fixed
[ ] Sales/admin informed

SOP 14: Loading Verification

Process Code: LOADING_VERIFY_V1
Owner: Factory Supervisor
Frequency: Every dispatch

Purpose

Ensure correct material is loaded and dispatch proof is captured.

Steps

  1. Verify product before loading.
  2. Verify quantity while loading.
  3. Check that rejected/hold bricks are not loaded.
  4. Take photo of loaded vehicle.
  5. Note vehicle number.
  6. Send loading confirmation.

Checklist

[ ] Product checked
[ ] Quantity checked
[ ] Quality checked
[ ] Vehicle number noted
[ ] Loaded vehicle photo taken
[ ] Dispatch confirmation sent

SOP 15: Vehicle Maintenance Checklist

Process Code: VEHICLE_CHECK_V1
Owner: Factory Supervisor
Frequency: Weekly and before major delivery

Purpose

Reduce delivery failures due to vehicle issues.

Checklist

[ ] Tyres checked
[ ] Fuel checked
[ ] Lights checked
[ ] Brakes checked
[ ] Driver available
[ ] Vehicle documents valid
[ ] Service due date checked
[ ] Any issue reported

Escalation

Inform management if vehicle is unsafe or unavailable.


SOP 16: Factory Visit Handling

Process Code: FACTORY_VISIT_V1
Owner: Sales/Factory Supervisor
Frequency: Whenever customer visits factory

Purpose

Give customers a professional factory visit experience and explain product benefits clearly.

Steps

  1. Welcome customer politely.
  2. Show product samples.
  3. Explain strength, cooling, interlock and cost/time benefits.
  4. Show production process if safe.
  5. Show proper stacking/curing.
  6. Ask project requirement.
  7. Handover lead details to sales.
  8. Send brochure/price details.

Checklist

[ ] Customer welcomed
[ ] Product shown
[ ] Benefits explained
[ ] Project requirement noted
[ ] Contact details captured
[ ] Sales informed
[ ] Follow-up created

SOP 17: Expense / Bill Handover

Process Code: BILL_HANDOVER_V1
Owner: Factory Supervisor / Accounts
Frequency: Whenever purchase/expense occurs

Purpose

Ensure all bills and expenses reach accounts correctly.

Steps

  1. Collect bill immediately.
  2. Take photo of bill.
  3. Mention purpose of expense.
  4. Mention supplier/vendor.
  5. Send to accounts.
  6. Keep physical copy safely.

Checklist

[ ] Bill collected
[ ] Photo taken
[ ] Supplier noted
[ ] Purpose noted
[ ] Amount visible
[ ] Sent to accounts
[ ] Physical copy stored

SOP 18: Safety and Machine Danger Zone

Process Code: MACHINE_SAFETY_V1
Owner: Factory Supervisor
Frequency: Daily

Purpose

Prevent accidents near machine and production area.

Rules

1. No hand inside danger zone during machine operation.
2. Only trained operator should handle machine.
3. Keep children/visitors away from machine.
4. Do not clean machine while it is running.
5. Report abnormal sound/vibration immediately.
6. Keep walkway clear.
7. Use basic PPE where required.

Checklist

[ ] Machine area clear
[ ] Operator available
[ ] No unsafe handling
[ ] Walkway clear
[ ] Cleaning done safely
[ ] Issue reported if any

SOP 19: Housekeeping and Walkway

Process Code: HOUSEKEEPING_V1
Owner: Factory Supervisor
Frequency: Daily

Purpose

Keep factory safe, clean and easy to work in.

Steps

  1. Keep raw material zones separate.
  2. Keep walkways clear.
  3. Remove broken bricks from working area.
  4. Keep tools in fixed location.
  5. Keep cement storage dry.
  6. Clean machine area after production.
  7. Close factory only after housekeeping check.

Checklist

[ ] Walkway clear
[ ] Broken bricks removed
[ ] Tools stored
[ ] Cement protected
[ ] Machine area cleaned
[ ] Material zones neat

SOP 20: Supervisor Escalation SOP

Process Code: ESCALATION_V1
Owner: Factory Supervisor
Frequency: Whenever issue occurs

Purpose

Ensure critical issues are reported quickly.

Escalate Immediately If

Machine breakdown
High rejection
Wet/contaminated red soil
Cement shortage
Labour shortage
Customer complaint
Dispatch delay
Wrong loading
Safety incident
Vehicle breakdown
Material shortage
Quality doubt

Escalation Message Format

Issue:
Time:
Product/Batch:
Impact:
Photo/video:
Action already taken:
Support needed:

9. SOP Improvement Register

Create a page/table called:

SOP Improvement Register

Fields

Date
SOP Name
Process Code
Suggested By
Current Problem
Suggested Improvement
Reason / Benefit
Photo Attached?
Priority: Low / Medium / High
Status: Open / Under Review / Approved / Rejected / Implemented
Reviewed By
Review Date
Implementation Date
Remarks

Improvement Workflow

flowchart TD
A[Staff suggests improvement] --> B[Supervisor reviews]
B --> C{Valid suggestion?}
C -- Yes --> D[Send to SOP owner]
C -- No --> E[Close with reason]
D --> F[Owner approves]
F --> G[Update SOP]
G --> H[Mark implemented]

Rule

Anyone can suggest. Only SOP owner or management can approve official SOP changes.


10. Process Automation Mapping

Add this section at the bottom of every SOP.

Automation Readiness

Telegram command:
n8n workflow:
Odoo object:
Approval role:
Supabase table:
Status:

Example for Raw Material Receiving:

Telegram command: /soil
n8n workflow: wf_raw_material_receipt_v1
Odoo object: purchase.order / stock.picking
Approval role: Factory Supervisor
Supabase table: raw_material_receipts
Status: Future automation

Example for Production Output:

Telegram command: /production
n8n workflow: wf_production_output_v1
Odoo object: mrp.production
Approval role: Factory Supervisor + QC
Supabase table: production_batches
Status: Future automation

11. Permissions

Create Docmost groups:

Management_Admin
SOP_Editors
Supervisors
Staff_Viewers

Permission Rules

Management_Admin

Can:

SOP_Editors

Can:

Supervisors

Can:

Staff_Viewers

Can:


12. Visual Design Requirements

Each SOP should use:

Large title
Icon or emoji
Short purpose
Process flow diagram
Step cards
Do/Don’t table
Checklist
Photo placeholders
Escalation box
Improvement suggestion section

Use colour meaning:

Green = Approved / Correct
Yellow = Hold / Check
Red = Reject / Stop / Escalate
Blue = Information / Record update

Every physical-process SOP should include placeholders for real factory photos:

[PHOTO: Correct example]
[PHOTO: Wrong example]
[PHOTO: Work area]
[PHOTO: Tool/material]
[PHOTO: Final approved output]

13. Physical Poster Output

For these SOPs, create a print-friendly A4/A3 version:

Red Soil Receiving & Moisture Check
Raw Material Separation Zone
MIB 8-inch Mixing Recipe
First 20 Bricks Approval
20-Brick Mini-Stack & Sleeper Method
Visual QC / Hold / Reject
Machine Safety
Housekeeping
Loading Verification

Each poster should have:


14. First Week Onboarding Page

Create a page:

New Supervisor First Week Plan

Monday

Understand factory layout.
Review dashboard.
Follow Daily Opening Checklist.
Observe raw material zones.
Submit first-day observation.

Tuesday

Focus on raw material receiving and separation.
Check red soil moisture/storage.
Suggest improvements.

Wednesday

Focus on mixing and first 20 bricks approval.
Capture photos of correct/incorrect samples.

Thursday

Focus on stacking, sleepers, curing and hold/reject zones.
Standardize batch card method.

Friday

Focus on dispatch planning, loading verification and vehicle checklist.

Saturday

Submit weekly report.
Submit SOP improvement suggestions.
Discuss with management.

15. Weekly Supervisor Report Page

Create a page/template:

Weekly Supervisor Report

Week:
Supervisor:
Total production:
Top product produced:
Rejected quantity:
Main defect reason:
Raw material issues:
Machine downtime:
Labour issues:
Dispatch issues:
Customer/factory visit updates:
SOP improvement suggestions:
Support needed from management:
Photos attached:

16. Acceptance Criteria

The implementation is complete when:

  1. Docmost has all required spaces.
  2. The Supervisor Dashboard is created.
  3. All 20 SOP pages are created.
  4. Each SOP has process code, owner, purpose, flow diagram, steps, checklist, records and escalation.
  5. SOP Improvement Register is created.
  6. New Supervisor First Week Plan is created.
  7. Weekly Supervisor Report template is created.
  8. At least 9 SOPs have print-friendly poster sections.
  9. Pages are mobile-readable.
  10. All SOPs are linked from the main dashboard.
  11. Every SOP has an automation mapping section for future n8n/Odoo integration.
  12. Placeholders are added for real factory photos.

17. Implementation Notes for Claude

When creating content in Docmost:

  1. Use clean headings.
  2. Use short sections.
  3. Use tables for checklists.
  4. Use Mermaid diagrams wherever possible.
  5. Use emoji/icons only where they improve readability.
  6. Keep language practical and factory-friendly.
  7. Do not create long theoretical explanations.
  8. Every SOP should be immediately usable by a new supervisor.
  9. Add “PHOTO PLACEHOLDER” blocks wherever real factory photos should be inserted.
  10. Add “PRINT VERSION” section for physical SOP poster pages.

18. Final Output Expected

Claude should create:

1. Complete Docmost workspace structure
2. One-stop Supervisor Dashboard
3. 20 SOP pages
4. SOP Improvement Register
5. First Week Supervisor Onboarding Plan
6. Weekly Supervisor Report Template
7. Print-friendly SOP poster sections
8. Automation mapping sections for n8n/Odoo future workflows

The final system should make the new factory supervisor feel:

“I know what to do every morning.
I know how to control production.
I know how to check quality.
I know when to escalate.
I know where to report.
I know how to suggest improvements.”

You can paste this directly into Claude and say: